Local News

Changed traffic conditions on Big River Way at South Grafton

Published

on

Changed traffic conditions on Big River Way at South Grafton

Motorists are advised of changed traffic conditions from next week on Big River Way at South Grafton to carry out safety improvement work near Heber Street.

Work will be carried out from Monday 21 June to widen the road shoulder on a 200 metre section of road to allow for improved traffic movements around the intersection.

Work will be carried out from 7am to 6pm on weekdays and from 8am to 1pm on Saturdays, and is expected to take two weeks to complete, weather permitting.

The northern access to Heber Street will be closed for the duration of the project, with a detour in place during this time.

Traffic control and a reduced speed limit will be in place for the safety of workers and motorists.

Delays of up to five minutes may be experienced and motorists are advised to allow extra travel time, drive to the conditions, and follow the directions of signs and traffic control..

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

Advertisements

Latest News

Exit mobile version